
Installation handover
Carry current scope, access information, items, dependencies, evidence and exceptions to site and back.
Browser-only entry: nothing typed here is saved. Print or save as PDF before closing this template, or use the matching CSV where available.
01 · Pre-departure release
Confirm the pack is current02 · Items and site result
One line per item or location| Item / location | Qty issued | Installed / delivered | Evidence ref | Exception / owner |
|---|---|---|---|---|
03 · Completion and return
Do not hide incomplete workThis checklist does not replace the competent risk assessment, method statement, electrical/structural control, equipment inspection, work-at-height plan or contractual sign-off your work requires.
Site team
Date
Next action owner