Skip to content

Estimating and quoting

A clearer basis for every quote.

Keep the scope, material costs, labour assumptions and revisions alongside the price you present. Explore the estimating model and try the public costing worksheet.

Spectra guide · Source review: 17 September 2026

At a glance

Sign estimating and quoting software should help a team turn a defined production brief into a reviewable commercial record. The useful test is whether somebody can explain the scope, source figures, labour and waste assumptions, margin method, version history and release conditions without reconstructing them later.

01 / Start with scope

A number is only as reliable as the job it describes.

Capture the deliverable, quantity, dimensions, finish, evidence source and site responsibility before calculating. Mark each input as confirmed, supplied, measured or assumed. An unresolved survey or access condition belongs beside the estimate, not in somebody's memory.

This page uses one fictional illuminated fascia to explain the method. The figures are synthetic teaching inputs, not market rates, customer evidence or a recommended price.

Scope itemExample basisRelease consequence
Fascia size and quantityOne fascia; customer-supplied dimensions pending survey checkEstimate may be reviewed, but not released to production
Face, returns and illuminationIllustrative specification; supplier cost dated for this estimateAny component change requires a revised cost and proof check
Access and installationInitial ground-access assumptionSurvey must confirm access method, timing and competent review

02 / Worked estimate

Show the calculation, its definitions and its uncertainty.

In the synthetic first estimate, materials are £720, bought-in illumination components £280, workshop labour is 18 hours at an illustrative internal rate of £38 per hour, and installation/travel is £460. Direct cost is therefore £2,144. A 12% internal overhead allocation adds £257.28, producing a £2,401.28 cost base.

The example uses gross margin on selling price—not markup on cost. At a fictional 32% target margin, £2,401.28 ÷ (1 − 0.32) gives a £3,531.29 selling basis before tax, terms and final commercial rounding. Replace every amount and commercial rule with your own current evidence.

Estimate lineTransparent basisSynthetic amount
MaterialsCurrent illustrative supplier basis£720.00
Bought-in componentsIllustrative supplier basis£280.00
Workshop labour18 hours × £38/hour£684.00
Installation and travelInitial access assumption£460.00
Direct costSum of the four lines above£2,144.00
Overhead allocation12% × £2,144.00£257.28
Cost baseDirect cost + overhead£2,401.28
Selling basis£2,401.28 ÷ 68%£3,531.29

03 / Revise, do not overwrite

Keep the reason for each quote version visible.

The fictional survey finds that the initial access assumption is wrong. Installation rises by £320 and workshop planning adds two hours (£76). The revised direct cost is £2,540; the same stated 12% overhead method produces a £2,844.80 cost base and a £4,183.53 selling basis at the illustrative 32% margin.

Version 1 remains a superseded record. Version 2 identifies the access change, the proof version it accompanies, the assumptions that remain open and the person who accepts the commercial revision. Acceptance of a quote is not, by itself, evidence that artwork, technical review or production release is complete.

RecordDecisionState
Estimate version 1Ground-access assumption; £3,531.29 selling basisSuperseded after survey
Estimate version 2Changed access + two planning hours; £4,183.53 selling basisReady for commercial review
Proof and production releaseConfirm accepted scope, current proof and required competent checksSeparate controlled decisions

04 / Reconcile actuals

Close the loop without rewriting history.

After the fictional job, actual direct cost is £2,571: materials £745, components £280, 19.5 workshop hours at the same £38 internal rate (£741), and £805 installation/travel. Applying the same 12% allocation for comparison gives £2,879.52—£34.72 above the revised £2,844.80 cost base.

Record the £25 material difference, £19 labour saving and £25 installation difference separately. Approved customer changes, estimating assumptions, purchasing variance, rework and operational delay are different causes. One synthetic job is a learning example, not evidence for changing a rate card.

ComparisonRevised estimateSynthetic actualVariance
Direct cost£2,540.00£2,571.00+£31.00
12% allocation£304.80£308.52+£3.72
Comparable cost base£2,844.80£2,879.52+£34.72

05 / Spectra status

Use the example to evaluate the workflow—not to infer a live pricing engine.

Spectra's local sample workspace demonstrates connected job context and reviewable quote records. This page does not claim that production calculation rules, acceptance controls, accounting sync or supplier pricing are verified live capabilities.

The free worksheet calculates a browser-local scenario from values you enter. A production setup would still need approved cost definitions, permissions, tax and rounding rules, revision ownership, application verification and any external provider access.

CapabilityEvidence hereStatus
Connected quote reviewLocal sample workspaceDemonstrated locally
Costing arithmeticFree browser-local worksheetUtility only; not product proof
Production calculation engineNo verified application evidence in this sliceNot claimed
Accounting or supplier syncExternal provider access requiredDependent / not claimed live

Bring the job. Explore the next step.

Open the estimating guide