Prepare the fitting handover.

Record scope, access, dependencies, installation contact and completion checks before the job leaves the workshop.

Spectra guide · Source review: 3 November 2026

Use the working documents

Start blank, or inspect the clearly labelled fictional example.

Download editable CSVOpen printable A4 sheetOpen fictional completed exampleDownload fictional example CSV

At a glance

A good handover exposes current information and records what happened. It does not replace the competent safety, structural, electrical, work-at-height or contractual controls required for the installation.

01 / Release

Confirm the pack before departure.

Identify the current scope, site contact, access window, delivery plan, item count, escalation owner and the approved safe-working records the team must use.

02 / Complete

Record outcome item by item.

Link completed items to evidence. If a location, component or customer dependency prevents completion, state it plainly and assign the next action instead of marking the whole visit complete.

Use one row per issued item or location. installed_or_delivered should say what happened to that row only. A snag stays in exception_or_snag with a next_action and owner; it is not cleared by a successful row elsewhere on the sheet.

03 / Return

Bring exceptions back into the job trail.

Customer comments, snags, return visits and potential variations need distinct ownership. Reconcile them with the quoted scope under approved commercial controls.